My 2006, 387 hull #106 has developed. a concerning problem with the cast alloy sparcraft mast step secures the base of the mast to the deck. The mast step is secured to the deck via 4 corner bolts and in my case the casting has fractured in 2 of the corners so now only secured via 2 bolts with the remainder no longer effective.
After sourcing the replacement part #FM-580 from Sparcraft France, next steps were to secure a rigger to undertake the work and prepare for the day to ensure the riggers costs were minimised. In our case we elected to jack the mast manually to avoid significant cost blowouts the use of a crane can trigger.
Preparation tasks:
- Source some 2 mm high-density polyethylene plastic sheet, trace a template of the mast step with a marker, cutting this using scissors seemed to work best, this is required to
You need to be logged in to see the rest of this content. Catalina380-IA members, please login.
To join please fill out a membership application (Association->Membership Application) and send a check to the address on the form.